Aviation Consulting, LLC Project Profiles
Managed the design and the implementation of a work card system for aircraft
modifications. The system optimized the flow of the work cards
over the entire aircraft modification project or scheduled maintenance
event. The system also enhanced reporting capabilities.
Implemented and designed enhancements for an engine power-by-the-hour
cost forecasting system. The system was designed to produce
forecasts, accruals, and budgets, as well as, tactical scenario
options. The system was also used for financial reporting.
Managed the maintenance support for a bay-capacity management
system. The system was designed to document the flow of the
maintenance bay usage. The system was also used for reporting the
daily operational management of the each aircraft maintenance bay.
Developed and implemented a hardware and capital tracking system.
The system increased the required visibility for analysis and
monitoring. The Technical Operations Controller division used the
system.
Designed, developed and implemented a software application used to
forecast power by the hour expenses for jet engines and auxiliary power
units ($41 plus million). Prior to implementation of the system,
challenges existed with forecast variances. After the
implementation of the system, the forecasting issues were eliminated.
Performed a Six Sigma project to reduce the maintenance check span for
the B737 1/4D maintenance check. The project revealed several
indicators as to the cause for the increasing span. The project
led the effort to reduce the maintenance check span and yielded the
consistent check span production for the B737 1/4D maintenance check.
Led a team on a special project to investigate accidents, loss of
productivity, and fuel consumption during aircraft taxi-tow operations
at Newark International Airport. We recommended a super tug
system, which proved so successful that it is still in place
today. The implementation reduced the productivity loss and the
fuel consumption during aircraft taxi-tow operations.
Managed the upgraded and the enhancement of a DOS version hangar
planning system. The system increased aircraft visibility to
Scheduling, Marketing and Financial Planning. The Fleet Planning
module increased visibility of aircraft, which saved the air carrier
from having to purchase several aircraft to fulfill summer capacity
needs.
Modeled a system to forecast pilot training needs during a conversion
period from turbo-prop equipment to jet equipment requirements.
The model incorporated union rules and regulations, specific business
needs and FAA requirements. The model facilitated the corporate
transition from turbo-prop equipment to jet equipment.
Produced a model to monitor flight crew utilization with productivity
measures and dollar impact. The model also supported the forecast
for reserve flight crew demands with the incorporation of the specific
union rules. The model helped corporate management and the union
during challenging union negotiations.
Implemented a system at the Newark International Airport to reduce the
time required to position flight crews after heavy snowstorms or other
disruptive events. Prior to the system implementation, flight
crew re-positioning took two to three days. After the system
implementation, re-positioning took only one day.
Streamlined the ground operation process for aircraft handling in
Daytona Beach International Airport for a local air carrier. The
process improvements included station operation and aircraft ground
handling processes. The process implementations resulted in
effective and efficient aircraft and passenger handling activities.
|